Fume Hood Installation Checklist: What to Plan Before Delivery

AirGuard Pro benchtop fume hood on its shipping pallet before installation

A fume hood arrives as a heavy crate, but it doesn't protect anyone until it is connected to exhaust, utilities and a balanced room. Most installation delays come from items nobody planned for: a missing blower, a doorway that is too narrow, or a worksurface without a cup sink. Use this checklist to line everything up before your hood ships.

1. Space and access

  • Measure the space, including ceiling height above the hood for the duct collar and ductwork.
  • Measure the path in. Check doorways, corridors, elevators and turns from the dock to the lab. Benchtop hoods weigh several hundred pounds; the AirGuard Pro ranges from 459 lb (48") to 616 lb (96").
  • Pick a good location away from doors, walkways and supply air diffusers, where cross drafts can pull fumes out of the hood.
  • Leave service clearance for removable side panels, the sash and utility connections.

2. Support: base cabinets and worksurface

  • Base cabinets sized to the hood width. Fume hood base cabinets are made for this, with acid or flammable storage options.
  • An epoxy worksurface sized to the hood. If the hood has cold water, order the worksurface with a cup sink and plan the drain.
  • A level, square base. Cabinets and worksurface must be level so the sash travels smoothly.

3. Exhaust: ductwork and blower

  • Exhaust volume. Give your mechanical engineer the hood's CFM and static pressure from the cut sheet. See face velocity and CFM explained.
  • Ductwork sized to the duct collar and CFM, made of a material compatible with the chemicals used, and run as directly as possible.
  • A blower selected for the hood, ductwork and exhaust type, usually located on the roof so the duct stays under negative pressure inside the building.
  • The discharge located and sized so exhaust doesn't re-enter air intakes.

4. Makeup air and room balance

The room needs supply air to replace what the hood exhausts. Without it, doors whistle, face velocity drops and the hood won't contain fumes. Have your HVAC engineer confirm makeup air and plan to balance the room after the hood is running.

5. Utilities

  • Electrical: a circuit for the hood's lights and receptacles, installed by a licensed electrician.
  • Water and drain if the hood has cold water.
  • Gas if the hood has a gas fixture, connected by a qualified plumber.
  • Blower controls so users can start and stop the exhaust.

6. Receiving the shipment

  • Fume hoods ship by freight to the curb or dock unless inside delivery is arranged. Plan the equipment and people to unload and move the crate.
  • Inspect on delivery. Note any damage or shortage on the delivery receipt and take photos before signing.
  • Keep the hood upright and on its pallet until it is at the installation location.

7. Installation

Follow the manufacturer's installation manual step by step. For the AirGuard Pro this includes removing the counterweight shipping screws, checking sash travel, setting the hood on the worksurface, connecting utilities and installing the airfoil. Our Resources page has the full installation manuals for the AirGuard Pro and DemoPro.

8. Start-up and testing

  • Run the exhaust and confirm airflow into the hood.
  • Measure face velocity with a calibrated anemometer on a grid across the sash opening.
  • Set up the airflow monitor so it alarms if airflow drops.
  • Consider as-installed testing. Many facilities require an as-installed ASHRAE 110 test.
  • Label the hood with the test date, face velocity and sash height.
  • Train users on sash height, working 6" inside the sash and responding to the alarm.

Printable checklist

Item Who handles it
Location, clearances and delivery path Facilities or project manager
Base cabinets and worksurface Ordered with the hood
Ductwork, blower and discharge Mechanical engineer and contractor
Makeup air and room balance HVAC engineer and balancer
Electrical, water, drain and gas Licensed electrician and plumber
Unloading and moving Receiving team or rigger
Face velocity and ASHRAE 110 testing Qualified test technician

Get the documents

Cut sheets, prints and installation manuals for our fume hoods are on the Resources page. Installation isn't included in product prices, but we can quote it. Call 616-407-0252 or email sales@labfurniture.com.